The latest science and technology news from the Solomon Islands
Provided by AGP| Monthly Highlights |
| Key Metrics Summary | ||||||
| Global Energy Capacity |
Self-Mining Hash Rate1 |
Co-Mining Hash Rate2 |
Self-Owned Rigs |
BTC Mined |
AI Cloud ARR |
Colocation AI Data Center |
| 3.0 GW | 65.5 (EH/s) | 8.4 (EH/s) | 218K | 783 | ~$69M | Tydal, Norway in advanced stages of negotiations |
SINGAPORE, May 12, 2026 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ: BTDR) (“Bitdeer” or the “Company”), a world-leading technology company for AI and Bitcoin mining infrastructure, today announced its unaudited operations updates for April 2026.
Management Commentary
"April marked another month of disciplined execution across our integrated AI and Bitcoin mining platform. Our AI cloud business sustained strong momentum, with ARR increasing to approximately $69 million, a 60% increase month-over-month, underscoring both the scale of enterprise demand for high-performance AI infrastructure and our ability to convert that demand into durable, contracted revenue. Importantly, we are in advanced stages of negotiations with a prospective colocation tenant for our Tydal, Norway site, which we expect would mark a defining milestone in our colocation strategy and unlock a significant new long-term revenue stream," said Matt Kong, Chief Business Officer of Bitdeer. "In parallel, our self-mining hashrate continues to improve, reaching approximately 65.5 EH/s, up over 400% year-over-year, while our co-mining hashrate has grown to an incremental 8.4 EH/s, reinforcing Bitdeer's position as one of the largest publicly listed Bitcoin miners by total hash rate under management and reflecting the continued ramp-up of our SEALMINER fleet.” Mr. Kong continued, “With our differentiated 3.0 GW power portfolio, expanding AI cloud capacity, and accelerating commercial traction, we remain confident in delivering sustained, profitable growth for our shareholders in the months ahead.”
_________________________________
1 Self-Mining (Operated in self-owned datacenters) refers to cryptocurrency mining for Bitdeer’s own account, whereby its mining rigs are operated in self-owned datacenters
2 Co-mining (Operated in 3rd party datacenters) refers to cryptocurrency mining for Bitdeer’s own account, whereby its mining rigs are operated in third-party datacenters
Crypto Mining Update:
CRYPTO Mining, R&D, Manufacturing:
Key Crypto Metrics:
| Metric | April 2026 | March 2026 | April 2025 |
| Hash Rate Metrics: | |||
| Self-Mining (Operated in self-owned datacenters) | 65.5 | 65.1 | 12.4 |
| Co-Mining (Operated in 3rd party datacenters) | 8.4 | 4.4 | - |
| Other Proprietary Hash Rate4 | 5.3 | 1.4 | - |
| Hosting5 | 8.2 | 7.2 | 12.7 |
| Total Hash Rate under Mgmt.6 (EH/s) | 87.4 | 78.1 | 25.1 |
| Mining Rig Metrics: | |||
| Self-Mining1 | 218,000 | 207,000 | 98,000 |
| Co-Mining2 | 33,000 | 18,000 | - |
| Hosted | 46,000 | 37,000 | 81,000 |
| Total Mining Rigs under Mgmt. | 297,000 | 262,000 | 179,000 |
| BTC Mined3 | 783 | 661 | 166 |
| BTC Held7 | 73 | 31 | 1,246 |
3 Includes BTC from self-mining operations and BTC from co-mining operations.
4 Other Proprietary Hash Rate includes the hashrate from Bitdeer’s cloud hashrate business, mining rigs delivered in the crypto mining datacenters but not deployed and the mining rigs temporarily offline due to limited economic benefit.
5 Hosting encompasses a one-stop mining machine hosting solution including deployment, maintenance, and management services for efficient cryptocurrency mining.
6 Total hash rate under management as of April 30, 2026, across Bitdeer’s primary business lines: Self-mining, Co-mining, Cloud Hash Rate, and Hosting.
7 Bitcoins held does not include Bitcoins from customer deposits but does include Bitcoins that are pledged as collateral by us.
Bitdeer AI Update:
Colocation AI Data Center:
AI Cloud Key Metrics:
| Metric | April 2026 | March 2026 |
| GPU Amount Deployed | 4,184 | 2,128 |
| GPU Types | H100, H200, B200, GB200 | H100, H200, B200, GB200 |
| Utilization Rate2 | 92% | 94% |
| GPUs Under External Subscription | 3,323 | 1,948 |
| ARR3 | ~$69M | ~$43M |
_________________________________
2 Utilization Rate as of the last day of the respective month is calculated as the total number of GPUs under internal and external orders divided by the total number of deployed GPUs.
3 ARR as of the last day of the respective month is calculated by multiplying the daily revenue generated from all contractually obligated GPU orders on that specific day by 365. This metric provides an annualized view of the revenue run-rate based on active contracts at the end of the reporting period
Infrastructure Summary:
| Site | (MW) Capacity |
Energization Timing4 |
Planned Usage |
Construction Update | |
| Online Electrical Capacity: | |||||
| 1) | Rockdale, TX | 563 | Online | Crypto to Colocation / AI Cloud | In active evaluation of AI transition |
| 2) | Knoxville, TN – phase 1 | 37 | Q4 ‘26 | Crypto to AI Cloud |
Phase 1 AI data center conversion design work initiated, targeting to complete by Q4 ’26. |
| 3) | Knoxville, TN – phase 2 | 49 | Q1 ‘27 | ||
| 4) | Wenatchee, WA | 13 | Q4 ‘26 | Crypto to AI Cloud | AI data center design documents and building permit application submitted for approval. Core equipment is being delivered in succession; we plan to begin with a GB300 cluster. Dismantling of the crypto mining datacenter started in March 2026. Completion targeted Q4 ’26. |
| 5) | Molde, Norway | 84 | Online | Crypto and in early assessment of converting to AI Cloud | |
| 6) | Tydal, Norway – phase 1 | 50 | Q4 ‘26 | Crypto to Colocation |
Planning and design continue to advance. Orders for critical long-lead equipment have been placed. Engaged Data Center Installations AS as Bitdeer’s design and construction partner for Tydal AI datacenter conversion |
| 7) | Tydal, Norway – phase 2 | 175 | Q4 ‘26 | ||
| 7) | Gedu, Bhutan | 100 | Online | Crypto | |
| 8) | Jigmeling, Bhutan | 500 | Online | Crypto | |
| 9) | Oromia Region, Ethiopia | 50 | Online | Crypto | Construction of the 50 MW site has been completed and energized, with ongoing energization in phases driven by SEALMINER deliveries |
| 10) | Massillon, OH | 121 | Online | Crypto | |
| 11) | Cyberjaya, Malaysia5 | 2 | Online | AI Cloud | |
| Online Electrical Subtotal: | 1,744 | ||||
|
Pipeline Electrical Capacity: |
|||||
| 1) | Massillon, OH | 74 / 26 | Q3 ’26 | Crypto | Due to delivery delays for key electrical components, 74 MW is expected to be energized in phases during Q3 ’26. Reconstruction of the two fire-damaged buildings (26MW) is currently underway and expected to be rebuilt and energized by the end of Q3’ 26. We anticipate that the total reconstruction cost will be almost fully recovered through the supplier’s insurance coverage. |
| 2) | Clarington, OH | 570 | To be updated | Colocation | 570 MW of power under contract with a local utility. Timing of power availability and construction may be affected by ongoing legal proceedings filed by a neighboring company, American Heavy Plate Solutions, LLC., which is under extensive influence from MHR, a New York based PE firm founded by Mark H. Rachesky. Design and other preparation work continues. |
| 3) | Niles, OH | 300 | Q4 ‘28 | Colocation / AI Cloud | 300 MW grid-interconnected development site, with target energization in Q4 ‘28. The project includes 41.8 acres of owned land and a transmission line extension agreement with a local utility company |
| 4) | Rockdale, TX | 179 | 2026 | Colocation / AI Cloud | In Planning |
| 5) | Fox Creek, Alberta, Canada | 101 | Q2 ‘27 | Crypto | 101 MW site acquired, fully licensed and permitted for the construction of an on-site natural gas power plant. Assessing current design potential to accommodate future AIDC requirements. Groundbreaking planned for June 2026. |
| 6) | Cyberjaya, Malaysia10 | 9.5 | Q4 ‘26 | AI Cloud | In Progress |
| Pipeline Electrical Subtotal: | 1,259.5 | ||||
| Total Global Electrical Capacity: | 3,003.5 | ||||
_________________________________
4 Indicative timing for completion of power. All timing references are to calendar quarters and years
5 Capacity under lease arrangement
Upcoming Conferences and Events
About Bitdeer Technologies Group
Bitdeer is a world-leading technology company for AI and Bitcoin mining infrastructure. Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers and building AI computational infrastructure to support the AI revolution. Bitdeer handles complex processes involved in computing such as equipment procurement, transport logistics, data center design and construction, equipment management, and daily operations. Bitdeer also offers advanced cloud capabilities to customers with high demand for artificial intelligence. Headquartered in Singapore, Bitdeer has deployed data centers across multiple countries, including the United States, Norway, Bhutan, and Ethiopia. To learn more, visit https://ir.bitdeer.com/ or follow Bitdeer on X@Bitdeer and LinkedIn @Bitdeer.
Investors and others should note that Bitdeer may announce material information using its website and/or on its accounts on social media platforms, including X, formerly known as Twitter, Facebook, and LinkedIn. Therefore, Bitdeer encourages investors and others to review the information it posts on the social media and other communication channels listed on its website.
Forward-Looking Statements
Statements in this press release about future expectations, plans, and prospects, as well as any other statements regarding matters that are not historical facts, may constitute “forward-looking statements” within the meaning of The Private Securities Litigation Reform Act of 1995. The words “anticipate,” “look forward to,” “believe,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “target,” “will,” “would” and similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain these identifying words. Actual results may differ materially from those indicated by such forward-looking statements as a result of various important factors, including factors discussed in the section entitled “Risk Factors” in Bitdeer’s annual report on Form 20-F, as well as discussions of potential risks, uncertainties, and other important factors in Bitdeer’s subsequent filings with the U.S. Securities and Exchange Commission. Any forward-looking statements contained in this press release speak only as of the date hereof. Bitdeer specifically disclaims any obligation to update any forward-looking statement, whether due to new information, future events, or otherwise. Readers should not rely upon the information on this page as current or accurate after its publication date.
For investor and media inquiries, please contact:
Investor Relations
Tesh Dahya, Head of Investor Relations
tesh.dahya@bitdeer.com
Media
Elev8 New Media
Jessica Starman, MBA
bitdeer@elev8newmedia.com
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.